What a draft contains
- Summary of the position.
- Applicable rules: the section of IRC section 41 or the regulations, or the state rule, the request is tested against.
- The facts and detail, drawn from the matched documents.
- Supporting documents listed as exhibits, and items marked To follow.
- Status: Strong, Weak or Missing, with what is outstanding before the response is sent.
One response per project
The project questions are answered for each business component separately. The company-wide items are answered once and included in every project's response. The vision-system response in the sample claim runs to about 5,700 words; the gripper-arm response to about 6,300.
Editing and checking
Every draft is editable in place and your edits carry into the download. Drafts are produced by software, including AI, and can contain errors. Before a response is used, each factual statement, document reference and unsupported assumption needs checking. If requested, a person at Swanson Reed can review your mock audit results and re-perform the mock audit for assurance. The review checklist sets out how.
