The claim
| Project | Qualified wages | Supplies | Contract research | TaxTrex position paper |
|---|---|---|---|---|
| QRA 1: Two-finger gripper arm (12 kg payload) | $1,104,000 | $48,600 | — | Yes |
| QRA 2: Machine-vision system upgrade | $738,300 | — | $96,000 | No |
Scores
QRA 1 has no red flags and only minor gaps (federal readiness score 95 out of 100; higher is better). QRA 2 carries two red flags: F4 (time allocation estimated after year-end) and S2 (three remote engineers in the state wage base). The company-wide items are Missing on the state reconciliation (S3) and the state filing requirements (S7).
| Federal | Texas | Band | |
|---|---|---|---|
| QRA 1 (documents and position paper) | 95 | 100 | Low / Low |
| QRA 2 (documents only) | 61 | 50 | Medium / High |
| Company-wide items | 78 | 44 | Low / High |
(readiness scores; a higher score is better)
The fix plan for QRA 2
For QRA 2, with every fix done the projected readiness score is Federal 95, Texas 100 (higher is better). The projection assumes each fix produces the evidence it describes. The federal projection depends on the time allocation (F4) and contemporaneous documentation (F6) fixes, which need records made during the work, such as time records, tickets or test logs; a position paper alone does not resolve them, and records that were never created cannot be recreated. The state score only moves once the remote engineers' wages are apportioned; a position paper does not change a payroll fact.
- FX16: Upload the TaxTrex position paper for this project (creditARMOR and TaxTrex are products of Swanson Reed). Low effort; it organizes the existing evidence for F2 and F3. It does not cure F4 (time allocation estimated after year-end) or F6 (contemporaneous documentation), which need records made during the work, such as time records, tickets or test logs.
- FX4: Apportion wages by work location using payroll address data. Medium effort; S2.
- FX3: Document each remote engineer's work location and remove out-of-state wages from the state base. High effort; S2.
- FX11, FX14, FX6, FX7, FX9, FX2 follow, ordered by impact against effort.
The IDR-style responses
Each project's response has its ten project items and the seven company-wide items, each a page or two: a summary, the applicable rules, the facts, exhibits and a status note. The gripper-arm response is 32 pages as PDF. Samples are available on request.