Read the reasons first
Each rating says what was matched and what was not. "The ticket export covers the gripper team only" is a different problem from "no contemporaneous records were uploaded". The first is a missing export; the second may be a record that was never kept.
Prioritize
- Red flags first: they can override the band.
- Then the fix plan order: impact against effort.
- Company-wide items once, since they apply to every project.
Find the records that exist
- Ticket and version-control systems hold dated history that is rarely exported in full.
- Test equipment and lab systems keep logs.
- Payroll systems hold work-location and withholding codes.
- Contracts live with procurement or legal, not always with the project team.
Re-run and compare
After adding records, run the mock audit again and compare the ratings. In the sample claim, adding a project's TaxTrex position paper resolves four questions at once. A reassessment only reflects what the new records show; verify them before relying on the revised result.
